BREINIG ON THE EUREGIOBAHN

[LOG: Stolberg, September 16]
The link at Breinig to the Euregiobahn is going to take a little while longer because the rails have to be upgraded and further money is required. However, things are moving ahead. There is the link with Langerwehe to the Euregiobahn and the ring between Stolberg and Alsdorf, which is to be completed by the end of next year. So things are moving ahead.

http://www.az-web.de/